What change should appear on the quotation?
Give the purchasing line a material identifier and attach the approved description of the chemical change. State how many distinct variants the laboratory expects to receive and who can authorise a substitution. Two quotations can both offer a modified peptide while one includes only the material and the other includes a labelled control or an additional analytical report. Compare the deliverables line by line before choosing a supplier.
Bachem · Custom peptide modification and analytical services


Where does feasibility end and supply begin?
Ask the supplier to separate its initial feasibility opinion from the specification it will commit to at order acceptance. Reserve a place for the label name, location reference, expected presentation and report set. If a proposed modification is offered only after review, give it a separate decision date. This lets procurement compare a firm scope with a conditional scope without treating the two as equivalent.
How do you compare proposals with different report sets?
Suppose the lower quote includes a one-page certificate while another includes a chromatogram, a mass spectrum and a stated amount basis. Ask the receiving scientist which material decision requires each item. A future audit might need original reports, while a preliminary catalog comparison may only need the named modification. Put each required file on the purchase order with its lot-link requirement. Procurement can then evaluate what an extra charge actually buys and negotiate missing evidence before ordering.
Worked example
When legal and procurement teams use different names for a proposed modification, place the buyer’s controlled identifier beside the supplier’s quoted name. Ask the responsible project reviewer to sign off that pairing. Reuse the approved pair on the purchase order and supporting document index.
Prepare your inquiry
Compare the quoted material and its evidence as separate deliverables.